Theater Renovation at Live Oak High School – MVE Institutional – Morgan Hill, CA
The 16,000 sq. ft. high school theater, originally designed by AKH and constructed in 1975, was renovated to upgrade mechanical, plumbing, electrical and theatrical aspects of the facility. A comprehensive seismic upgrade was also required in order to comply with the current Building Code. Structural improvements included strengthening the wood-framed, high-roof diaphragm, wood shear walls and concrete foundations to resist the required loading. Completed in 2010.